Skip to main content

Engineering Detail Checklist

General Plan Requirements

  1. Blank space upper right-hand corner (for batch stamping) – all sheets [Recommended]
  2. Minimum plan size 22″ x 34″ (no max size)
  3. Signed and current Washington State Engineer’s Stamp – all design sheets
  4. Detail statement noted on plan (on cover sheet, general notes)
  5. North Arrow & Drawing Scale
  6. If County jurisdiction project, note if it is fronting a City street
  7. Label any public right-of-way under WSDOT ownership

Documents

  1. Signed and Dated Engineering (ENG) Application Form (PDF)

Resources