A 3 digit inspection code is required to schedule an inspection through our interactive phone system.

3 DIgit inspection codeStructural Inspection Types
105Reinforce Streel
110Forms / Footing / Steel
115Foundation
120Foundation Stem Walls
125Post & Beam / Underfloor Framing
130CMU Bond Beam Reinforce Steel
135Interior Footings / Slab
140Framing
145Shear Walls Exterior
150Shear Walls Interior
155Hold Downs and Embedments
160Landing / Deck / Stairs
165Mobile Home Tie Downs
170Roof Sheathing

3 DIgit inspection codeNon-Structural Inspection Types
205Fire Caulking
210Radon Mitigation
215Insulation / Slab
220Insulation Walls / Ceiling / Vault
225Insulation Floors
230Sheetrock Nailing
235Interior Footings / Slab
240Ceiling Grid
245Skirting
250Emergency Lighting
255Miscellaneous Building
260Investigative Inspection – BLDG
270ADA Internal
275ADA External (Parking / Access / Ramps)

3 DIgit inspection codeMECHANICAl Inspection Types
305Rough Gas Pipe
310Rough HVAC
315Rough Refrigeration Lines
320Medical Gas Start
325Medical Gas Finish
330Fuel Tank Piping
335Exhaust / Ventilation Ducts
340Commercial Kitchen Hood
345Paint Booth
350Woodstove
355Ceiling Grid Mechanical
360Miscellaneous Mechanical

3 DIgit inspection codePlUMBING Inspection Types
400Groundwork Plumbing
405Underfloor Plumbing
410Rough Plumbing
415Plumbing
420Plumbing Fixture
425Cap Sewer Line
430Septic Tank Pumped and Filled
435Rough Roof Drain
440Sewer Service
445Water Service
450Irrigation System
455Storm Sewer System
460Infiltration System
465Storm Drain / Infiltration
470Storm Water / Drainage
471Private Sewer Lateral
472Private Water Lateral
473Grease Trap / Interceptor
474Site Drainage
475Medical Gas Piping / Rough
476Medical Gas Piping / Start Test
477Medical Gas Piping / Finish Test
478Miscellaneous Plumbing

3 DIgit inspection codeZoninG Inspection Types
505Erosion Preconstruction Meeting
510Erosion Control
511Erosion Monitoring
515Tree Protection
520Grading
525Setbacks
530Internal Site Circulation / Driveway
535Landscape
540Private Street
545Parking / Striping
550ADA Parking / Access / Ramps
555Road Frontage Improvements
560Site Geo Grid / Retaining Walls

3 DIgit inspection codeFIRE Inspection Types
605Acceptance Test
610Miscellaneous Fire
615Above Ground Dry Start Test
620Above Ground Dry Finish Test (after 24 hours)
625Above Ground Pipe Cover
630Above Ground Hydro Start Test
635Above Ground Hydro Finish Test (2 hours)
640Under Ground Pipe Cover
645Under Ground Hydro Start Test
650Under Ground Hydro Finish Test
655Under Ground Flush
660Empty Tank / Piping Removed
665Underground Tank Remove / Pre-Fill

3 DIgit inspection codeELECTRICAL Inspection Types
705Temporary Service
710UFER Ground
715Underground Electrical
720In-Slab Electrical
725Rough Wiring
730Rough Wiring – FRI
735Ceiling Grid Electrical
740Ceiling Grid Electrical – FRI
745Electrical Service
750Feeder
755Miscellaneous Electrical
760Low Voltage
765Pool Bonding
770Investigation Electrical

3 DIgit inspection codeFINAL Inspection Types
266TCO Inspection
280Final Adult Family Care
285Final Insulation Floors / Attic
288Final Roofting
290Final Demo
295Final Building
390Final Gas Piping
395Final HVAC
490Final Grease Trap / Interceptor
495Final Plumbing
580Final Grading
590Final Erosion Control
595Final Sign (Size / Zoning)
695Final Fire
790Final Electrical – FRI
795Final Electrical

Contact Us